Installation procedures
Preparation work before installation
Please make sure that the sliding gate is correctly installed, the gate rail is horizontal, and the gate can be manually moved smoothly before
installing the gate opener.
Cable installation
In order to guarantee the normal operation of the gate opener and protect the cables from damages, please bury the motor & power cable
and controlling cable separately with two PVC tubes.
Concrete pedestal
Please cast a concrete pedestal with the size can be 500mm x 300mm, depth be 250mm in advance, so as to rmly install BD1522 gate
opener. Please make sure the distance between the gate and gate opener is appropriate before casting the pedestal.
Embedded screws
Power line
Main engine installation
A) Dismantle the plastic housing on the main engine before installation and keep relevant fasteners properly.
B) Please prepare the power line for connecting the mounting plate to the main engine (the number of power supply cable cores should not
be less than 3 PCS, the sectional area of cable core should be over 1.5mm² and the length should be determined by users according to the
situation on installation spot)
C) Please unlock the main engine before installation, the unlock method is: remove the rubber key cover, insert the key, and open the manual
release bar till it rotates by 90° as shown in Figure 4. Then turn the output gear and the gear can be rotated easily
Opening your life
Concrete
Opening your life
Mounting plate
Foundation bolt
6
Bulldog
Code:
Figure 3
www.accessmatic.com
1522
BD1522