PUSH-BUTTON OPERATION / LEVER OPERATION /
BT BUTTON OPERATION
1. Steam is delivered by turning the side knob
with a steam cloud sing on it.
2. Hot water is delivered by means of the central
knob (or side compact-ergonomic knob) with the
hot water drop sign.
3. To deliver coffee from the coffee spouts, fill the
filter holder with the correct quantity of coffee
put it back above the coffee spout and press the
relevant push-button on the steel front (if the
machine is fitted with an electronic console, refer
to chapter 7).
4. The double-range pressure gauge on the front
constantly measures boiler pressure (0,9 - 1,1
BAR) as well as coffee delivery pressure (8-10
BAR).
REGULAR USE
1. When the machine is switched on, the electro-
nic card checks water level inside the boiler. After
approx. 3 seconds, the filling pump and solenoid
valve are enabled for filling. When the set level is
reached, the card enables the console and its push
buttons. Coffee delivery is started by pressing he
relevant push button and stopped by pressing the
same button again. The above-indicated opera-
tions are signalled by the relevant LEDs lighting
up and going off.
2. The boiler filling function is disabled while
INSTRUCTIONS FOR ELECTRONIC DOSING
1. Press and keep press the button
1. Press button
*
relating to the coffee spout of
ing to the coffee spout of the dose to be programmed.
the dose to be programmed. Keep it pressed for
Keep it pressed for longer than 5 seconds and check
longer than 5 seconds and check that all pro-
the contemporaneous switch on of all programming
gramming LEDs on the console light up. This
leds on the console with the symbol
indicates that the programming function has
lamping or the pressed button on the console with
been started correctly.
this symbol
This indicates that the programming
function has been started correctly.
2. Press any of the buttons corresponding to the 4
2. Press any of the buttons corresponding to the
doses that can be programmed. The LED correspond-
4 doses that can be programmed. The LED corre-
ing to button
or
and that corresponding to the
*
sponding to button
and that corresponding
dose being programmed remain on.
to the dose being programmed remain on.
5. Adjust pressure inside the boiler to the usual
specifications by means of the relevant screw on
the pressure gauge.
6. Adjust coffee delivery pressure to the usual
specifications by means of the relevant screw of
the internal pump.
7. Frequently check the boiler level indicator and
double-range pressure gauge.
8. To deliver coffee in the lever model, activate
the manual lever positioned latelly to the group.
coffee is being made. If at the end of the coffee-
making cycle the boiler level probe is above the
water level, the boiler filling function will be ena-
bled to restore water level.
3. 2-minute filling time-out. At the end of this
interval, the LEDs will blink and the machine
will stop. Switch the machine on again to restart
it.
4. Coffee delivery time-out. After 2 minutes,
delivery of the current coffee doses is interrupted.
or
relat-
3. When the desired quantity of coffee is reached,
3. When the desired quantity of coffee is reached
press again the button to interrupt product delivery.
(4 doses), press any of the dose buttons to inter-
4. The console which is near the group of main switch,
rupt product delivery.
memorize automatically the others.
or the led
Continue if necessary, to set the remaining consoles.
4. The console on the left automatically stores
the memory of the others. Continuem if neces-
sary, to set the remaining consoles.
Ch. 6
The coffee machine
is ready to make
perfect coffees
always and
everywhere.
Ch. 6A
Ch. 7
Safe, and efficient
electronic compo-
nents
Page 3
GB
Coffee delivery is
started by pressing
the relevant push
button and stopped
by pressing it again.