Descargar Imprimir esta página

NuTone ZN80L Guía Para La Instalación página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

Page 6
New Construction Installation
6
Insert Mask and
Finish Ceiling
• Install ceiling material.
• Cut out around Housing.
CAUTION
IN ORDER TO PREVENT
MOTOR/CONTROL DAMAGE:
If the blower was unplugged, power must be
disconnected (see page 2, WARNING item 2)
before inserting motor plug into control assembly.
7
Install Grille
8
Install Bulbs
1
See Page 12 for Operations, Cleaning and Maintenance, and Troubleshooting.
1
2
2
ZN80L
ZN110L Installation Guide
n
Mask protects unit
during construction.
Remove before
installing Grille.
3
3
4
Night Light
(purchase
separately)

Publicidad

loading

Este manual también es adecuado para:

Zn110l