1. Frame in rough opening. Use dimensions
shown in Figure 9 for the rough opening.
If installing in a corner, use dimensions
shown in Figure 10 for the rough opening.
The height is 26
the wall opening above.
2. Carefully set fireplace in front of rough
opening with back of fireplace inside wall
opening.
23.25"
Figure 9 - Rough Opening for Wall
Installation
CAUTION: Do not operate
fireplace without hood in place.
1. Fireplace hood is positioned on top of
shipping inner pack.
2. Remove top of firebox by removing 2 screws
located on each end (see Figure 11).
3. Insert the hood along the upper side of
the heat insulation board (see Figure 11).
Attach hood with 3 screws.
4. Reattach firebox top by reinserting the 2
screws from step 2.
Step 1
12
INSTALLATION
/
", which is the same as
1
2
28.75"
ASSEMBLING HOOD
Remove 2
Screws from Top
Firebox Panel
Figure 11 - Hood Installation
www.sureheat.com
3. Attach gas line to fireplace gas regulator.
See Connecting to Gas Supply, page 13.
4. Check all gas connections for leaks. See
Checking Gas Connections, page 15.
IMPORTANT: When finishing your firebox,
combustible materials such as wall board,
gypsum board, sheet rock, drywall, plywood,
etc, must have 1/2" clearance to the sides
and top of the firebox. Combustible materials
should never overlap the firebox front.
Figure 10 - Rough Opening for Corner
Installation
Step 2
Hood
Step 3
Replace 2
Screws
Insulation
Board
200252-01A