Descargar Imprimir esta página

Daikin 2MXM40A2V1B Manual De Instalación página 16

Publicidad

11 Maintenance and service
The fuses, circuit breakers, or locally installed protection
devices are installed according to this document, and
have NOT been bypassed.
Check if marks (room A and B) on the wiring and piping
match for each indoor unit.
Check if the priority room setting is set for 2 or more
rooms. Keep in mind that the DHW generator for Multi or
the Hybrid for Multi shall not be selected as the priority
room.
10.2
Checklist during commissioning
To perform a wiring check.
To perform an air purge.
To perform a test run.
10.3
Trial operation and testing
Before starting the test run, measure the voltage at the
primary side of the safety breaker.
The piping and wiring work match.
The stop valves (gas and liquid) on the outdoor unit are
fully open.
Initialization of the Multi system can take several minutes depending
on the number of indoor units and options used.
10.3.1
To perform a test run
INFORMATION
If the unit runs into an error during commissioning, see the
service manual for the detailed troubleshooting guidelines.
Prerequisite: Power supply MUST be in the specified range.
Prerequisite: Test run operation may be done in cooling or heating
mode.
Prerequisite: Test run should be done in accordance with the
operation manual of the indoor unit to make sure that all functions
and parts are working properly.
1 In cooling mode, select the lowest programmable temperature.
In heating mode, select the highest programmable temperature.
2 Measure the temperature at the indoor unit inlet and outlet after
running the unit for about 20 minutes. The difference should be
more than 8°C (cooling) or 15°C (heating).
3 First check operation of each unit individually, then check
simultaneous operation of all indoor units. Check both heating
and cooling operation.
4 When test run is finished, set the temperature to a normal level.
In cooling mode: 26~28°C, in heating mode: 20~24°C.
INFORMATION
▪ Test run can be disabled if necessary.
▪ After the unit is turned OFF, it cannot be started again
for 3 minutes.
▪ During cooling operation, frost may form on the gas
stop valve or other parts. This is normal.
INFORMATION
▪ Even if the unit is turned OFF, it consumes electricity.
▪ When the power turns back on after a power break, the
previously selected mode will be resumed.
Installation manual
16
11
Maintenance and service
NOTICE
General maintenance/inspection checklist. Next to the
maintenance instructions in this chapter, a general
maintenance/inspection checklist is also available on the
Daikin Business Portal (authentication required).
The
general
maintenance/inspection
complementary to the instructions in this chapter and can
be used as a guideline and reporting template during
maintenance.
NOTICE
Maintenance MUST be done by an authorised installer or
service agent.
We recommend performing maintenance at least once a
year. However, applicable legislation might require shorter
maintenance intervals.
NOTICE
Applicable legislation on fluorinated greenhouse gases
requires that the refrigerant charge of the unit is indicated
both in weight and CO
2
Formula to calculate the quantity in CO
tonnes: GWP value of the refrigerant × total refrigerant
charge [in kg] / 1000
12
Disposal
NOTICE
Do NOT try to dismantle the system yourself: dismantling
of the system, treatment of the refrigerant, oil and other
parts MUST comply with applicable legislation. Units
MUST be treated at a specialised treatment facility for
reuse, recycling and recovery.
INFORMATION
To protect the environment, make sure to perform an
automatic pump down operation when relocating or
dismantling the unit. For the pump down procedure, refer
to the service manual or the installer reference guide.
13
Technical data
▪ A subset of the latest technical data is available on the regional
Daikin website (publicly accessible).
▪ The full set of latest technical data is available on the Daikin
Business Portal (authentication required).
13.1
Wiring diagram
The wiring diagram is delivered with the unit, located inside of
the outdoor unit (bottom side of the top plate).
13.1.1
Unified wiring diagram legend
For applied parts and numbering, refer to the wiring diagram on the
unit. Part numbering is by Arabic numbers in ascending order for
each part and is represented in the overview below by "*" in the part
code.
checklist
equivalent.
equivalent
2
2MXM40+50A
R32 Split series
3P600450-5L – 2021.12
is

Publicidad

loading

Este manual también es adecuado para:

2mxm50a2v1b