Installation (continued)
9
Checking the operation of the
pop-up
□
Operate the lift rod knob (B) up and down to
verify that the stopper (H) opens and closes
correctly.
Operation
1
Flushing and checking for leaks
IMPORTANT: After installation is complete, remove the
aerator from the faucet (A) to ush the water lines. Do not
lose the gasket (1) in the aerator.
□
Ensure the faucet (A) handle is in the off
position, and turn on the water supply to check
for leaks. If you discover any leaks, check your
connections to ensure they are installed properly.
□
Remove the aerator and housing (if applicable).
Turn on the hot and cold water handle to allow
the water to run for at least one minute. This
ushes away any debris that could cause
damage to internal parts.
□
Turn off the water and reinstall the aerator and
housing (if applicable).
B
H
10
Making the water supply
connections
NOTE: The hot side inlet tube is indicated by a label.
If the label is not present, the hot supply tube is the longer
of the two inlet tubes.
□
Use 1/2 in. I.P.S. faucet connections (2), or use
supply line coupling nuts (3) (not included) with
a 3/8 in. O.D. ball-nose riser (1).
NOTE: Before tightening the faucet connector to the water
supply, apply a second wrench to the supply tube tting.
This will prevent the supply tube from moving or twisting
when tightening the faucet connector. Do not overtighten.
1
3
1
8
2
A