15
5/16"
17
STEP 16
19
STEP 18
21
STEP 20
STEP 20
STEP 3
23
STEP 23
25
STEP 25
STEP 27
15. Raise the wick to its highest position and tighten the
16
16. Check the wick height. It should be 5/16 above the collar.
17. Check for the correct clearance between wick holder
18a. Reinstall the tip-over switch assembly by pushing the
18b. Connect the 3 connectors (3EA) with the circuit board.
18
18c. Remove the connector (1EA) from the ignitor.
STEP 17
19. Check the function of the tip-over safety stop by push-
20. Reinstall the automatic ignition assembly.
21. Reinstall the wind cover A / B.
22. Reinstall the cabinet.
23. Tighten the 5 screws on the cabinet and reinstall the
STEP 19
20
24. Reinstall the combustion chamber and the fuel tank.
25. Reinstall the wick adjusting knob. Close the front plate.
STEP 21
22
24
STEP 26
wing nuts in several steps.
and draft tube. It should be the same all around.
extinguish knob.
ing the extinguish button to upset the pendulum.
sensor at the back of the cabinet.
Install the batteries in the battery case and fill the fuel
tank with Qlima Premium Quality Fuels. Set the tank
into the heater and wait at least 60 minutes for the
new wick to fully saturate with the fuel.
4
87