4. HOW TO USE
1. Place the lifting tower over a firm and flat
surface on its working place.
2. Remove the outriggers (H) from their
transport supports (C) to do so, loosen the
retaining knob (P) a few millimeters, then in-
sert the legs into their working positions (G)
checking that they are fixed by the safety pins
(K). The longest ooutriggers must be placed
at the front, under the load.
3. Adjust the outrigger stabilisers (J) by tur-
ning the cranks (I) to level the lifting tower.
Ensure it is in a vertical position checking the
bubble level.
4. Place the forklifts (E) in a horizontal po-
sition and secure them with the safety pins.
5. Place the load as close to the lifting tower
as possible.
6. Elevation: Turn the winch handle (B) cloc-
kwise to lift the load until the wished posi-
tion, checking that the safety pins (A) are
activated (T).
7. To avoid lifting tower overloading, do not
separate uneccessarily the line array from the
body of the lift. See fig. 2 (page 23). Follow
loading instructions. See fig. 3 (page 23).
8. Lowering: release the safety pin (A) doing
the step U. To release them, turn slightly the
winch handle to elevate the load. In the nor-
mal working position, the load's weight does
not allow to release the safety pins. Once the
safety pin (A) is unblocked, turn
Fig. 1
S
T
I
H
K
J
A
U
E
F
the winch handle (B) anticlockwise until
lowering the load and the second profile is
completely down. Release the safety pins (A)
and keep on lowering the lifting tower until
the third profile is completely down. Unblock
the safety pin (A) and continue lowering the
lifting tower until it is completely folded at its
minimum height.
9. For the lifting towers' transport it is neces-
sary to bring down all the profiles, releasing
the safety pin (A) doing the step U. Fix the
profiles with the safety pins (A) in position
(S) and fix them with the transport support
(F).
5. MAINTENANCE
1. Periodically check cable status. If the ca-
ble seems to have broken wires or crushing,
replace immediately with a new one. Never
use the lifting tower with cables in bad con-
ditions. Only use galvanized steel under EN
12385-4. Cable maximum load: 2.000kg. Ca-
ble torsion resistance: 1.770N/mm². Cable
diameter: 6mm. Cable composition: 6x19+1.
2. The lifting tower is supplied fully greased
from factory. Nevertheless, the crown gear of
the winch, to the threaded bar of the stabili-
ser outriggers and the profiles, because of its
use periodical greasing is recommended.
DO NOT GREASE OR LUBRICATE BRA-
KING MECHANISM
Braking disks were greased with a special
heat and pressure resistant grease. No other
product must be used to prevent negative in-
fluence on brake functioning.
3. Lifting tower AT-04, must be checked by
an expert a minimum of once a year as per
its use.
4. Only original spare parts must be used to
B
ensure continued safe use. The user loses all
guarantee rights if spare parts other than the
C
originals are incorporated or the product is
modified in any way.
5. To request any spare part, contact the
manufacturer or an authorised distributor
within your territory.
ENGLISH
WARNING:
13 13