Installation (continued)
6
Installing the plaster guard
□
Place the plaster guard (I) onto the valve body (D)
and secure with the screws (H).
NOTE: Be sure to position the plaster guard (I) correctly
onto the valve body (D), with the side marked "SHOWER"
facing upward.
H
D
I
7
Installing the shower arm
□
Insert the long end of the shower arm (B) through
the shower flange (A), and wrap thread sealant
tape (not included) around the long end of the
shower arm (B) in a clockwise direction, as
shown.
□
Install the long end of the shower arm (B)
into the pipe elbow inside the wall. Carefully
tighten the shower arm (B) with a clean strap
wrench. Do not over tighten.
□
Wrap thread sealant tape around the pipe
threads of the tub spout outlet (1, not included)
in a clockwise direction, as shown.
□
Connect the tub spout outlet pipe (the tub
spout outlet pipe should project 2-1/2 in. to 3 in.
from the finished wall) to the lower pipe elbow
(2, not included). Tighten the elbow and tub spout
outlet pipe connections with a strap wrench.
B
10
A
2
1
2 1/2 in. to 3 in.
Wall
1