Bycool blue line FLAT Instrucciones De Montaje página 18

24 v.
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

FLAT
ES
EN
Recommendations
for assembly
• Before starting the assembly read the instructions and follow
them during the installation process.
• Use suitable tools for each operation.
Electricity
• Switch off the ignition key.
• Disconnect the battery before starting the assembly.
• Secure the connection of the electrical components by
checking that they fit correctly.
!
When installing the evaporative unit in the ceiling, protect
the upper part of the cabin with a cloth or sheet to prevent
scratching. When installing Bycool Flat in the ceiling,
bear in mind that cabins are normally fitted with a hatch
and have a structure which can withstand the weight of
the unit. However, if this is not so and it is necessary to
open up the ceiling, or should the hatch material not be
sufficiently resistant (e.g. fibre, plastic, etc) the installer
must decide, under his sole responsibility, on the need to
reinforce the ceiling in order to prevent deformation,
breakage, incoming water, etc, and use the means
necessary to this end.
warning
Torque Wrench set
Allen Wrench Set
Spanner 10, 13, 14
Scissors
Tape Measure
Documentation included
Assembly Instructions
User Manual
Troubleshooting
Guarantee
!
Part no. 17 from the List of Parts Supplied must be
replaced every 12 months.
!
Dirna Bergstrom, s.l. will not be held responsible
for any faults arising from inappropriate handling or
installation of the equipment, or due to modifications
or replacements carried out without our written
authorisation.
!
See guarantee procedure for the product included in
Troubleshooting.
!
See the equipment User Manual for the correct
operation of the remote control and the control
panel.
18
Air conditioning for vehicles
Tools
220.AA6.4062
220.AA7.0003
220.AA7.0004
220.AA1.0010
!
warnings

Publicidad

Tabla de contenido
loading

Tabla de contenido