Descargar Imprimir esta página

Fantek T-100 Manual De Instrucciones página 16

Torre elevadora

Publicidad

Idiomas disponibles

Idiomas disponibles

All manuals and user guides at all-guides.com
4.- Operation
4.1.- Place the tower on a flat and solid surface in its site of operation.
4.2.- Pull the legs out of their support for transport (S) and insert them in their working
lodges (V). Check that they are fully inserted and fastened by the retaining safety
triggers (R).
SEE FIGURE 1.
4.3.- Attach the load to the tower using an adequate support (this may vary according
to the situation), so that it can move only in a vertical sense. The minimum load must be
25 kg.
SEE FIGURE 2.
4.4.- Up:
Unlock the safety bolt (M) and extend the tower by turning the winch handle (W)
clockwise (N1), thereby lifting the load to the desired location. Once in its position, lock
the safety bolt (M) in one of its fixing positions.
SEE FIGURE 3.
4.5.- Down:
Descending the load is done the other way round. Unlock the safety bolt (M) and turn
the winch handle counterclockwise ( N2 ) until the tower is completely folded down to
its minimum height.
SEE FIGURE 4.
Like when lifting a load, the tower may be stopped in any desired intermediate position.
4.6.- For the transport it is necessary to fold the tower by retracting its profiles completely
and fix them with the safety bolt (M). Dismount the legs by releasing the retention
triggers and put them in their transporting position (S).
SEE FIGURE 5.

Publicidad

loading