STEP 6
STEP 7
FIG. 1
Approach the Tension control (72) to the Tower (2) then connect Tension control wire (72 and 73). See Fig. 1.
Then x Tension control (72) on Tower (2) with Bolt (35) and Washer (36).
Put Tension control wire (73) out of Tower (2),
then connect Middle wire (78) and Sensor wire (79),
connect Hand pulse wires (81 and 82). Then insert
Tower (2) into Main frame (1), align the holes
and screw with Bolts (21), Washers (26 and 23).
Note: be careful when inserting the tower so as not to
damage the cables.
9 9
Note: Set the Tension
Control Knob at 1 to
ensure enough wire length
to connect the Tension
Control Wires (72 and 73).