Descargar Imprimir esta página

SCHULLER HERON 175197D Guia De Instalacion página 12

Publicidad

Idiomas disponibles

Idiomas disponibles

B.INSTALLATION ON A CONCRETE CEILING.(Fig.3)
ASSEMBLING THE FAN COMPONENTS:
A. Choose the height of the fan
Two tubes are included (short 12 cm and long 25 cm). The short tube will already be pre-assembled
in the anti-roll hemisphere. This gives the fan a total height of 42cm once mounted.
If you wish the fan to hang more (55 cm), you must replace the short tube with the long one.
To do this, you will need to remove the anti-roll hemisphere, along with the mounting screws and pins
from the short tube and place them in the same position on the long tube.
B. Connecting the downrod to the fan body (motor) (Fig.4)
- Remove the lower pin from the downrod and slide up the canopy and coupling cover as per the
diagram.
- Feed the cables from the body (motor) through the inside of the downrod, until they come out the
opposite end (ceiling bracket). Insert the downrod into the coupling and fix inplace using the pin and
the R clip and ensure it is secured in place using the locking screws.
Ensure they are screwed in proportionally on both sides. Push the coupling cover in place.
12

Publicidad

loading