Descargar Imprimir esta página

BWT Swimline RED-1 Instrucciones De Montaje Y Consejos De Utilización página 10

Publicidad

Idiomas disponibles

Idiomas disponibles

1.
IMPORTANT RECOMMENDATIONS
The control panel must be installed by professionals in accordance with the rules of the art and
standards in effect.
The control panel power supply must be protected by a 30 mA differential circuit breaker mounted
upstream from the control panel.
Before any intervention requiring the removal of the front plate, ensure that the power supply to the
control panel has been cut.
In the event that the fuse needs to be replace, use a fuse with the same rating and characteristics.
In order to improve our products, we reserve the right to modify the technical characteristics of our control
panels at any time without prior notice.
The text and drawings contained in this document are provided for information only
and reflect our knowledge at the time of printing. We therefore accept no liability
with respect to the use of said texts and drawings.
2.
LIST OF COMPONENTS SUPPLIED
1 Control panel SWIMLINE RED1
1 Solenoid valve
1 Sensor housing
1 Sensor with 20 m cable
6 Pozidrive wood screw 6x50 stainless steel A2
6 Bushing S8x40 nylon
2 Cable gland, 13, with nut
1 Cable gland, 16, with nut
1 SWIMLINE control panel bracket seal (60x25)
3.
MOUNTING THE CONTROL PANEL
Loosen the 6 plastic screws and remove the front panel.
1
Use the mounting bracket as a template for drilling.
3
10/32
2022/11 - Indice de révision : D - Code : 32935
Remove the holding screw from the mounting bracket.
2
Use the bushings and screws supplied to attach the bracket to the wall.
4
CONSTRUCTION & RÉNOVATION

Publicidad

loading