5.
WIRING INSTRUCTIONS
The following instructions are only applicable to connections to be carried out by the installer. The control panel
is pre-wired in the factory and must under no circumstances be modified at the risk of damage or accidents.
The sensors must be connected to the control panel in accordance with the diagram enclosed. Their power
cables must be run in protective sheaths (conduits) (see C-15-100 standard).
6.
HYDRAULIC CONNECTIONS
Connect the solenoid valve to the local water supply. The valve must be mounted with removable unions and
a stop valve must be installed upsteam. The valve should feed directly into the buffer tank and not the pool.
7.
ELECTRIC WIRING
Outlet 24 V to the solenoid valve
8.
SENSOR PLACEMENT
The sensor cab le must be proctected using an appropriate sheath (refer to the standard C15-100).
The sensor should be positionned in the pool as illustrated in the diagram on the following page.
The cable should not be more than 20 m long.
12/32
2022/11 - Indice de révision : D - Code : 32935
Delayed start regulation
Sensor connection
Power supply 230 V + Earth
CONSTRUCTION & RÉNOVATION