3
TOOLS AND MATERIALS
• Rule
• Pencil
• Spirit level
• Sealer
• Square
• Cutter
Personal protective equipment (ppe)
• Safety Goggles
4
BEFORE STARTING
N.B.:
i
The tub must be installed by at least two people�
CAUTION:
Damage risk. Do not lift the tub using its edge.
• Observe all local hydraulic and construction regulations�
• The following instructions are for qualified personnel with sufficient technical know-how and
experience to handle the product in total safety�
• This is a bathtub and must only be used for this purpose� Improper use of the tub shall relieve the
producer from all liability and invalidate the warranty�
• Unpack the tub and inspect it for damage� Put the tub back in its pack until it is required for
installation�
• Before installing the tub, check access to the final hydraulic connections.
• Check the type of connection and assembly for the tap�
• Do not install the tap over the overflow.
5
PREPARING THE SITE
• Make sure the floor and the platform (if mounted) offer a support of at least 800 kg (approximately
1800 lb) under the tub. Make sure the floor and supporting surface are flat and even.
• This tub can be installed on the floor or on a raised or recessed platform.
• If the tub is placed on the floor, drill a hole of the size indicated in the figure below; the trap must be
suitably positioned bearing in mind the dimensions of the tub (see Fig. 2).
Dimensions in centimetres
• Belts
• Woodworking tools and materials
• Rags
• Wooden spacers
Fig. 2
5