Descargar Imprimir esta página

Tripp-Lite SmartPro SMART2200RM2U Manual Del Usuario página 5

Ocultar thumbs Ver también para SmartPro SMART2200RM2U:

Publicidad

Idiomas disponibles

Idiomas disponibles

Mounting (Rack)
2-Post Mounting
2-post mounting requires a Tripp Lite 2-Post Rackmount Installation Kit (model: 2POSTRMKITWM,
sold separately).
Mounting (Tower)
Warning: When mounting the UPS system in a tower orientation, make sure the LCD
Screen panel is at the top of the UPS, not at the bottom.
Note: To mount the UPS in an upright (tower) position, 2-9USTAND is required (sold separately).
Rotate the LCD Screen panel for easy viewing
while the UPS is tower mounted. Insert a small
screwdriver, or other tool, in the slots on either
side of the panel. Pop the panel out, rotate it
and pop the panel back in place.
15-06-021-93-3088.indb 5
continued
5
6/3/2015 10:09:19 AM

Publicidad

loading