Descargar Imprimir esta página

MSW Proliftor PROFRAME 600 Manual De Instrucciones página 5

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
EN
CERTIFICATE OF INSPECTION
This product has been examined and accord with BGV D 6/10.00.
Inspector: QC 25
PROFRAME 600 Spare parts list
1
T type M12 x 60 bolt
2
Hexagonal bolt M12 x 70
3
Flat gasket Ø 12
4
Spring washer Ø 12
5
Nut M12
6
Cotter pin
PROFRAME 1000 Spare parts list
1
T type M12 x 60 bolt
2
Hexagonal bolt M12 x 70
3
Flat gasket Ø 12
4
Spring washer Ø 12
5
Nut M12
6
Cotter pin
MSW-PROFRAME-250 Spare parts list
1
T type M12 X 60 bolt
2
Hexagonal bolt M12 X 70
3
Flat gasket Ø 12
4
Spring washer Ø 12
5
Nut M12
6
Hexagonal bolt M10 X 50
7
Flat gasket Ø 10
8
Nut M10
9
Cotter pin
10
Rubber block
8
All manuals and user guides at all-guidesbox.com
U S E R M A N U A L
ATTENTION
Before using the electric hoist frame, please carefully read the user's instruction-
RANGE OF APPLICATION.
The electric hoist frame is applicable to electric hoist.
When the extension lenght of PROFRAME is 750mm, it is applicable to electric hoist
PROLIFTOR 1000 .
4 pcs
When the extension lenght of PROFRAME 600 is 750mm, it is applicable to electric
1 pc
PROFRAME 600.
When the extension lenght of MSW-PROFRAME-250 is 1100mm, it is applicable to
5 pcs
electric hoist SBS-FZ 250.
4 pcs
5 pcs
PROFRAME 1000
2 pcs
When the elctric hoist is in the place of extension lenght 750mm, its lifting capacity
should be less than 1000kg.
PROFRAME 600
4 pcs
When the electric hoist is in the place of extension lenght 750mm, its lifting capacity
1 pc
should be less than 600kg.
5 pcs
MSW-PROFRAME-250
4 pcs
When the electric hoist is in the place of extension lenght 750mm, its lifting capacity
5 pcs
should be less than 600kg. When the electric hoist is in the place of extension lenght
2 pcs
1100mm, its lifting capacity should be less than 250kg.
HOIST FRAME
1)
4
The installed pipe should be vertical seated on the supporting steel pipe with an
1
outside diameter of 48mm and a wall thickness of 6mm. The surface of supporting
steel pipe should be rough, not smooth and paint, in order to increase the friction.
5
Make sure the verticality and rigidity diameter of 48mm pipe in any case.
4
2)
5
Check every part of rack carefully to make sure there is no damaging and missing.
1
3)
The installed size H must be controlled of 380mm. The installed size H for MSW-
1
PROFRAME-250 must be controlled of 485mm.
1
4)
2
The installation must follow the picture, when permanent seat and cover plate bolt
2
has been clamped, the twisting force should controlled around 70Nm.
Rev. 10.02.2022
Rev. 10.02.2022
EN
9

Publicidad

loading

Este manual también es adecuado para:

Proliftor proframe 1000Proliftor msw-proframe-250