7
7B
7A
HOT
7 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (7A) to Faucet Inlets (7B). Hot water supply lines go into left
inlet. Cold water supply lines go into right inlet. (Supply lines are not included). Please
follow manufacturer's instructions when installing supply lines.
8
8 POP-UP ROD CONNECTION
Insert Lift Rod (8A) into hole at the back of Spout (8B).
ENGLISH
7B
7A
COLD
8A
8B
DRAIN BODY INSTALLATION
9
9A
9 POP-UP INSTALLATION
Install and adjust Pop-Up (9A) using separate instructions supplied with the Pop-Up
assembly.
10
10 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
FAUCET FUNCTION
11
HOT
COLD
11A
11 VALVE FUNCTION
By lifting the Lever Handle (11A) up, the valve will be activated allowing water to flow.
The water flow will increase by continuing to lift up the Lever Handle (11A). By rotating
the Lever Handle counter-clockwise, the water temperature will decrease to cold flow
only. By rotating the Lever Handle clockwise, the water temperature will increased to
hot flow only.
3
OPEN
11A