Installation
1
Marking the mounting location
□
Remove the set screw (DD) from the base of the
product posts.
□
Place the product in the desired mounting
location, using a level to position it accordingly,
and use a pencil to lightly mark the outline of the
posts.
□
Center the mounting bracket (BB) within the
marked post locations, and mark where the
screw holes will be drilled.
□
Repeat this step as needed for each bath
accessory.
NOTE: The included template (EE) may be used to mark the
mounting locations for the towel bars: A and B for the tissue
holder / A and C for the 18 in. towel bar.
3
Installing the product
□
Place the post (A, C) over the mounting
bracket (BB) and secure it with the set
screw (DD), as shown.
□
Repeat this step for the remaining
post (A, C).
NOTE: Ensure the towel bar (B) is inserted prior to
securing the second post (A, C) to the mounting bracket (BB).
DD
BB
2
Installing the mounting brackets
□
Drill 1/4 in. holes in the previously marked
locations.
□
Push the plastic anchors (CC) flush into the dry wall.
□
Fasten the mounting bracket (BB) to the wall with
the wood screws (AA).
□
Repeat this step as needed for each bath
accessory.
NOTE: When mounting the products to a wood wall, fasten
the mounting brackets (BB) to the wall using the wood
screws (AA). There will be no need for drilling or plastic
anchors (CC).
5
l P
a e
e s
c
n o
a t
t c
- 1
5 8
5-HD-GLACIER
CC
AA
BB
AA
BB
BB
DD
H
O
M
D E
P E
f
r o
u f
t r
e h
a r
s s
T O
C .
O
M
s i
a t
c n
. e