Descargar Imprimir esta página

Pfister Avalon 808-CBHC Instrucciones De Instalación página 4

Juego con acabado para ducha de mano

Publicidad

Idiomas disponibles

Idiomas disponibles

12
12A
CLOSED
FULL COLD
12 VALVE FUNCTION
By rotating the Lever Handle (12A) slightly counterclockwise, the valve will
be fully activated to the "COLD" position. The water temperature can be
increased by continuing to rotate the Lever Handle (12A) in a counterclockwise
direction.
13
UP
For
Shower
13B
13 TUB SPOUT FUNCTION
When the valve is turned on, water normaly flows through the Tub Spout (13A).
To activate the shower, turn valve on and pull the Knob (13B) up. Hold on until
water flows continiously from the shower arm.
14 UNIT START UP
Turn on hot and cold water supplies, and check all connections for leaks.
15
15C
15B
15 FINAL FLUSHING
For final flushing, turn valve on and allow water to run through the Tub Spout
(15A) for several minutes. Pull Spout Knob (15B) up to allow water to run through
Shower Hose (15C). Allow water to run for several minutes untill all foreign matter
clears the line.
FULL HOT
OPEN
13A
15A
ENGLISH
16
16 SHOWER HEAD INSTALLATION
Thread Hand Shower (16A) onto Hose (16B).
Make sure Hand Shower (16A) is securely tightened to Hose(16B).
17
17 HAND SHOWER FUNCTION
To adjust spray, turn switch (17A) to a desired spray pattern.
Right:
Pulsating.
Center: Pulsating with Full Spray.
Left:
Full Spray.
4
16A
16B
LEFT
CENTER
RIGHT
17A

Publicidad

loading

Este manual también es adecuado para:

Avalon 808 serie