8
Slide Post through top of Floating Dock Pipe Guide Bracket (8a). Position the Auger at the bottom of the Post
(8b). Once in position, tighten the two Bolts on the Auger Foot until they are secure (8c). Slide Post down until
the Auger touches the bottom of the lake and turn to imbed the auger into the soil. It is recommended that the
augers be drilled at least 18" into the bottom sediment.
Note: Be sure to leave enough room for the pipe above the guide to account for water fluctuation.
8c
Bolt
www.tommydocks.com
8a
8a
8b
9/16"
Bottom of
Post
Auger