Installation (continued)
7
Installing the handle
□
Place the handle assembly (J) onto the valve
stem (1) and tighten the set screw (U) with the
Hex wrench (Hex: 2.5mm, V). Insert the index (W).
Tighten the handle with the screw (I). Insert the
index (H).
□
Place the other handle onto the left (hot) valve
and install the same way.
9
Making the water supply
connections
□
Connect the water supply lines (1) to the
faucet inlets (2). (Supply lines are not
included.)
8
□
□
□
H
I
J
W
V
U
1
2
1
6
Connecting the hoses
Connect the hoses (Q) to the bottom of the hot
and cold end valves (L & M), as shown.
Align the middle body (D) in a position that will
allow maximum clearance to connect the
hoses (Q).
Carefully bend the hoses (Q) to t in the
available space, and carefully thread the hose
(Q) couplings onto the sides of the middle
body (D). Tighten all connections with a wrench.
L
D
Q
Q
M