LINEN TOWER INSTALLATION
1
1. Place the back of the tower (A) on a soft flat surface.
2. Rotate the legs (B) into the predrilled holes of the bottom panel.
LINEN TOWER INSTALLATION
2
1. Place shelf clips (1) into predrilled holes of the vanity (A). Then put the shelf (C) on it.
Please read instruction before assembly process
A
B
A
B
B
B
B
B
Figure 1
Figure 2