22 | English
Property classes
Standard screws
according to DIN
3.6
4.6
267
M16
55
73
M18
75
101
M20
107
143
M22
145
190
M24
185
245
Tips
Before screwing larger, longer screws into hard materials, it
is advisable to pre-drill a pilot hole with the core diameter of
the thread to approx. 2/3 of the screw length.
Note: Ensure that no metal particles enter the power tool.
After working at a low speed for an extended period, you
should operate the power tool at the maximum speed for ap-
proximately three minutes without load to cool it down.
Recommendations for optimal handling of the battery
Protect the battery against moisture and water.
Only store the battery within a temperature range of -20 to
50 °C. Do not leave the battery in your car in the summer, for
example.
A significantly reduced operating time after charging indic-
ates that the battery has deteriorated and must be replaced.
Follow the instructions on correct disposal.
Ladder clip
You can use the utility clip (4) for hanging the power tool to a
ladder, for example.
The screw of the ladder clip must be tightened
using a tightening torque of approx. 2.0–
2.5 Nm.
Control Via App
GDS 18V-1000 C / GDS 18V-1050 HC:
The power tool can be fitted with a Bluetooth® module which
enables wireless data transfer to certain mobile devices with
a Bluetooth® interface (e.g. smartphone, tablet).
In order to control the power tool via Bluetooth®, you will
need the "Bosch Toolbox" app. Download the app from the
corresponding app store (Apple App Store, Google Play
Store).
Then select the "My Tools" sub-item in the app. The display
of your mobile terminal device will show you all subsequent
steps required to connect the power tool to the terminal
device.
The following functions will be available when a connection
has been established with the mobile device:
– Registration and personalisation
– Status check, output of warning messages
– General information and settings
– Management
– Setting the speed levels
– Setting the working modes
1 609 92A 6HU | (10.05.2021)
5.6
4.8
6.6
5.8
92
98
110
122
126
135
151
168
178
190
214
238
240
255
290
320
310
325
370
410
Maintenance and Service
Maintenance and Cleaning
Clean the air vents on your power tool regularly. The
u
motor's fan will draw the dust inside the housing and ex-
cessive accumulation of powdered metal may cause elec-
trical hazards.
Remove the battery from the power tool before carry-
u
ing out work on the power tool (e.g. maintenance,
changing tool, etc.). The battery should also be re-
moved for transport and storage. There is risk of injury
from unintentionally pressing the on/off switch.
To ensure safe and efficient operation, always keep
u
the power tool and the ventilation slots clean.
After-Sales Service and Application Service
Our after-sales service responds to your questions concern-
ing maintenance and repair of your product as well as spare
parts. You can find explosion drawings and information on
spare parts at: www.bosch-pt.com
The Bosch product use advice team will be happy to help you
with any questions about our products and their accessor-
ies.
In all correspondence and spare parts orders, please always
include the 10‑digit article number given on the nameplate
of the product.
Great Britain
Robert Bosch Ltd. (B.S.C.)
P.O. Box 98
Broadwater Park
North Orbital Road
Denham Uxbridge
UB 9 5HJ
At www.bosch-pt.co.uk you can order spare parts or arrange
the collection of a product in need of servicing or repair.
Tel. Service: (0344) 7360109
E-Mail: boschservicecentre@bosch.com
You can find further service addresses at:
www.bosch-pt.com/serviceaddresses
Transport
The contained lithium-ion batteries are subject to the Dan-
gerous Goods Legislation requirements. The batteries are
suitable for road-transport by the user without further re-
strictions.
High-strength screws
6.8
6.9
8.8
10.9
147
165
196
275
202
227
270
380
286
320
385
540
385
430
510
715
490
455
650
910
Bosch Power Tools
12.9
330
450
635
855
1100