Descargar Imprimir esta página

Hayward Sheer 500 WFS512B6LED Manual Del Propietário página 11

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 5: Set LED Light in Waterfall
With wiring complete, the LED light is ready to be set in the niche. Lubricate the
O-rings on the light with the supplied lubricant, then use the light installation
tool (shown on the right) to gently press the light into the waterfall unit until the
ribs are aligned. Then, twist the light 90 degrees clockwise until it locks in place.
Step 6: Seal with Deck Lid Cover
Install the deck lid cover to the top of the collar with a ribbon of silicone adhesive.
When operating the waterfall,
gpm can vary as the ideal water effect is up to the user's personal preference. See graphic below.
2
3 (max)
2
1
Water Level
20
Manual Control
Turn on power to the pump controlling the waterfall system and adjust the flow control valve until
the ideal water effect is achieved.
When using a wall switch to control the light, the light must be set to UCL (Universal ColorLogic)
mode. This will allow the light to be controlled through power-cycling. The light should already be set
to UCL mode from the factory but if the light mode needs to be set, see the procedure on page 12.
To activate the light, simply turn on the switch powering the transformer. To deactivate the light, turn
off the switch. To advance to the next light program (fixed color or color show), turn the switch off,
then back on again within 10 seconds.
USE ONLY HAYWARD GENUINE REPLACEMENT PARTS
Operation
it is recommended to keep the water flow at 15 gpm per foot,
Projection (ft)
1
15
12
10
9
7
gpm / ft
but the
10

Publicidad

loading