Kostrzewa Mini Bio Luxury 12kW Manual De Uso página 66

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 177
9. Boiler start-up, operation and stopping, including emergency stop
66
9.5 Long boiler downtime and emergency stop
In case of long downtime:
press the main switch, disconnect the boiler pump, the circulating pump
and the burner
disconnect the power supply
CAUTION!
FREEZE PROTECTION FUNCTION IS NOT WORKING WITH
DISCONNECTED POWER SUPPLY.
close all valves
drain the boiler and the heating system via drain valve; open all cut-off,
control and vent valves to avoid freezing
bottom door must be open to avoid condensation
The emergency stop procedure is performed when the boiler condition or any
auxiliary device may cause boiler damage or hazard to the personnel.
CAUTION!
RAPID BOILER COOLING MAY INCREASE THE EXTENT OF DAMAGE.
Leader in pellet boilers
Emergency stop may be caused by:
no safety valve operation at exceeded allowable pressure
pressure section leakage
pressure section deformation
boiler room or auxiliary equipment explosion or fire
drain valve leakage
safety or control device failure
pressure gauge failure
circulating pump failure
flue gas explosion
pressure section fitting or welded joint leakage
drain pipe blockage
auxiliary equipment failure
other faults that cannot be removed during boiler operation due to safety
or technical reasons
Emergency procedure:
stop the boiler immediately (use the main power switch outside the
boiler room, if required)
use suitable fire-fighting measures (extinguishers) in case of a fire
Mini Bio Luxury 12; 21kW User Manual – EN 10.17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mini bio luxury 21kw

Tabla de contenido