Descargar Imprimir esta página

Hitachi WEH-6E Manual De Instalación Y Funcionamiento página 12

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
NAME OF PARTS
7 NAME OF PARTS
Ref.
8 UNIT INSTALLATION
Transport the products as close as possible to the installation location before unpacking.
Check the contents of the package:
WEH-6E
Installation and Operation Manual
(2) M6x15 screw and (2) M6 washers
Wall fixing support
8.1 SELECTION PROCEDURE FOR YUTAKI UNITS
!
C A U T I O N
WEH appliance is intended to be installed in an indoor place.
WEH installation must be done by professional installers.
Install the WEH with sufficient clearance around it for operation and maintenance as shown in the following figures.
Install the WEH where good ventilation is available. Do not install the WEH where there is a high level of oil mist, salty air or sulphurous atmosphere.
Working with no sufficient ventilation, in an enclosed space, should cause oxygen deficiency. Toxic gas should be produced when cleaning agent
is heated to high temperature by, e.g., being exposed to fire.
Do not install WEH near any flammable substance.
When installing some device next to WEH, keep clearance between WEH and any other obstacle of more than 500mm.
4
PMML0199A rev.4 - 12/2016
Qty.
Name
1
Tank body
1
Front E-casing
1
Back E-casing
1
Tank in-connection
1
Wall support
1
Tank front cover
1
Tank out-connection
1
Resistance
1
Tank body insulation
1
Tank body insulation
PART II - INSTALLATION
Ref.
Qty.
Name
1
PSW
2
3-pole contactor
1
Thermostat
1
Terminal board
1
Packing gland
2
Packing gland
1
PSW protector
1
Caution label
1
Indication poster
1
Wiring label

Publicidad

loading