Descargar Imprimir esta página

Allen + Roth TPGAZ2241 Manual Del Usuario página 23

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
20. Connect the edge bandings (O1/O2) in
the order shown on the right figure to the
roof supports (M) with corner covers (I) and
screws (HH) and bolts (FF).
Note: The slant beams should be connected
with the screws (HH).
Hardware Used
HH
M5 x 45 mm Screw
FF
M6 x 15 mm Bolt
AH
Wrench
AI
Wrench
RR
Cap M6
UU
Washer M6
21. Fix the assembled gazebo onto the
ground with the stake (AE).
Hardware Used
AE
Stake
20
I
O2
O1
I
X 4
X 6
X 1
X 1
X 6
HH
X 10
21
X 16
23
I
I
O1
I
O2
I
O1
UU
FF
RR
Assembled by 2 persons
I
O1
O2
I
O2
I
O1
I
M
O2
A
G
AE
H

Publicidad

loading

Este manual también es adecuado para:

4140479