Descargar Imprimir esta página

Palram Balance 8x8 Instrucciones De Montaje página 5

Ocultar thumbs Ver también para Balance 8x8:

Publicidad

During Assembly
Make sure
the
base
is
square by
measuring the diagonals and
level by using
a
spirit
level.
Peel
the film covering the
panel. Make sure
you install it
with
the
UV
protected
side
out.
You
may
use
Silicon
lubricant
spray
in
order to help you
slide
the panels into the profiles.
Do
not
spray
the Polycarbonate
panels.
Use
a
rubber mallet if
necessary.
All panels
with the stamped words
THIS
SIDE
OUT
must
be
facing out to create
full
UV
protection.
Remove plastic sticker
as
panels
are
locked
in place.
During assembly you will encounter the information icon, please refer to the
relevant assembly step for additional comments and
assistance.
This
icon indicates
that the installer should
be
inside the product.
This
icon indicates
that
Ithe
installer should
be
outside the product.
Step
3:
Refers
only for the extension
kit! The
extension kit contains
a
base
connector, either part
#8447
or
#7601.
Step 13: Tighten the
screws
once the back beam
is
set
accordingly (Diagram
b).
Step 30: Dismantle
Parts
#8227/8228
and
re-implement
in
Step
31.
Step 38:
Please
remove parts
#
8227/8228
and discard.
Step 52: Decide
on the
window's location before assembly. Windows
can be
installed
in
one
of
the
4
indicated options.
If
you
have
purchased
an
Extension
Kit,
please
note part 7316 should
be
assembled
with
its
short
end towards the window.
Step 64:
In
case
the
window
doesn't closed properly,
please release
the
screws,
adjust the profile
and
tighten the
screw.
Step 73:
Please
note you should insert the
screws
and
leave
as
is
as
shown
in
the circular
enlargements.
Step 80: Choose the appropriate anchoring according to the existing
base. screws
and masonry
anchors
are
not supplied.
/N
Important
Recommendations
Firmly connect the greenhouse to
a
level
position immediately after completion of the
assembly.
In
order to anchor the greenhouse
use
the designated manufacturer anchoring kit.
Anchoring the greenhouse
can also be
done
by
drilling
the
base
profiles and fastening it to
the ground using ground
screws
or spikes (screws and spikes are not supplied).
Tighten
all screws
once assembly
is
completed.
Please
note: Anchoring this product to the ground
is
essential
to
its
stability
and
rigidity.
It
is
required to complete this
stage in
order for your warranty to
be
valid.
Note:
all
the extension module
steps are
marked
with
a
dashed outline, should
be
performed
during the greenhouse assembly
process.
Screws
411
and nuts
412 are used
throughout the
assembly
process.
Screws
411
are
to
be
assembled from the outside and nuts
412
from the inside of the greenhouse.
If
not specified otherwise, do not fasten
screws and nuts
(411 &
412)
more than
2-3
turns only.
Do
not
tighten them until completion of
the panels' assembly.
These
2
icons
indicate if
screws'
tig htening
is
required or not.
However,
in
some steps,
temporary tightening of
a
few
screws may be
needed to prevent
a
profile from falling.

Publicidad

loading

Este manual también es adecuado para:

Balance 8x4 extension module