Before you begin - Read these instructions completely and carefully.
IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES.
Note to Installer – Be sure to leave these instructions with the Consumer.
Note to Consumer – Keep these instructions with your Owner's Manual for future reference.
Tools Needed
• 5/16" nut driver
• Pliers
• Slotted screwdriver
Parts included in bag with Sub-Base
Type A
Type B
4 required
2 required
4 nuts
Power Cord
Grommet
Type C
2 in bag, 6
attached
Type D
2 wall sleeve mounting
clips
Installation Instructions
for your new
RAK204D20H
208/230V, 20 Amp Subbase
Important Notes
• This unit must be properly grounded.
• Read this instruction before installing the sub-base to
the molded or metal sleeve.
CAUTION
The sub-base should be assembled to
the sleeve before securing the sleeve in the wall.
CAUTION
Electrical power must be disconnected
before installing the sub-base.
Electrical Requirements :
1. Electrical wiring may enter the sub-base through
any of the knockout holes provided in the sub-base
bottom or rear.
2. Refer to the unit nameplate for branch circuit
requirements.
3. All wiring should be done in accordance with the
local electrical codes and regulations.
4. Not approved for aluminum wire application.
5. When connecting the electrical wiring, the sub-base
must be properly grounded. See diagram on next
page. A ground wire from the supply line shall be
connected to sub-base grounding stud with one of
the supplied nuts.
31-5000843 Rev. 0 08-23 GEA