Descargar Imprimir esta página

cecotec READYWARM 1500 POWER CEILING Manual De Instrucciones página 44

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 4
ENGLISH
3. OPERATION
Assembly
Make sure that the heater is not lit before hanging it in a gazebo or under a balcony or roof.
1. Make sure that hook "A" is securely attached to the heater.
2. Attach hook "A" to a grab or hook it to a beam or post with a diameter of less than 20 mm.
If the diameter of the beam or post is more than 20 mm, fix the hook "B".
3. Plug the heater into a power socket.
NOTE
Wait until the heater has cooled down before moving it.
Fig. 3.
1. Ceiling
2. Wall
3. Floor
Remote control
1. Press the On/Off switch; the red light will flash.
2. Press P1 button on the remote control; the indicator light will stay on.
3. Press P1 to switch on the heater.
4. Press P1 button on the remote control twice.
4. CLEANING AND MAINTENANCE
Maintenance
Attention
Regular and thorough maintenance of the infrared heater is necessary for long and efficient
operation.
-
At least once a month, check that the reflector and the infrared (IR) sensor are clean.
-
The number of checks may be increased depending on the amount of dust in the
environment.
-
Check if the reflector, cable, or frame are deformed while cleaning the device. In case of
deformation, consult a qualified technician.
-
Check the power cord and plug while cleaning the appliance. In case of deformation,
consult a qualified technician.
-
It is recommended to replace the reflector every two years to ensure efficient operation.
Cleaning
Attention
44
READYWARM 1500 POWER CEILING

Publicidad

loading

Este manual también es adecuado para:

08262