NOTICE
Wiring and pipes in wall
Damage to wiring and pipes.
▶ Check wall for sufficient load-bearing capacity before drilling.
▶ Use suitable drilling tools and materials.
▶ Use suitable protective equipment.
▶ Have trained personnel drill holes.
▶ Do not drill holes close to wiring or pipes.
ü Wall plugs and screws chosen to match wall.
ü Floor has sufficient load-bearing capacity.
1. Mark drilling spots through the holes in the cabinet's rear and move cabinet out of the way.
2. Drill holes in wall, insert wall plugs and screw cabinet to wall.
7.
Assembly
B
CAUTION
Assembly work
Risk of crushing feet or hands when assembling and when closing drawers.
▶ Wear foot protection and safety gloves.
▶ Ensure safe footing on clean, level surface.
▶ Do not assemble by yourself.
8.
Maintenance
Frequency
Before the start of each shift
As required
9.
Cleaning
Do not use chemical, alcohol-based, abrasive or solvent-based cleaners. Wipe down powder-coated surfaces (such as body,
metal panelling, drawers, storage shelves) with lukewarm, dampened cloth. Clean polycarbonate windows with window
cleaner and a soft, clean, non-abrasive cloth.
10. Spare parts
Order original spare parts from the Hoffmann Group Customer Service.
11. Technical data
Load capacities
949501, 949503, 949506
949531
12. Disposal
Comply with the national and regional environmental protection and disposal regulations for correct disposal or recycling.
Segregate items into metals, non-metals, composite materials and consumables and dispose of them responsibly. Re-use is
preferable to disposal. Contact Hoffmann Group Customer Services.
Action
Check for externally evident damage, defects and for good condition. Check the
edges and guides for signs of wear.
If defective, immediately block access and prevent use.
Have the damage repaired immediately.
Grease any locks and wheels with multi-function oil.
Complete cabinet
500 kg
500 kg
Shelf
60 kg
80 kg
www.hoffmann-group.com
de
bg
da
en
fi
fr
it
hr
lt
nl
no
pl
pt
ro
sv
sk
sl
cs
es
hu
19