3.
On the right-hand leg of the frame, secure the clamp (J) to the leg using bolt M5x16 (K) and nut M5 (L).
Insert an M8x20 (H) bolt through the hole in the handle holder from below and secure it with an M8 (I) nut.
Tighten the screws firmly with the appropriate wrenches.
4.
Place the top frame beam (M) in position between the frame legs. Secure the parts with 4 M12x105 (N)
screws and M12 (E) nuts. Tighten the screws firmly with the appropriate wrenches.
N
N
5.
Connect the hydraulic jack (O) to the jack plate (P) using 2 M8x20 head screws (Q) and spring washers (R).
Make sure the jack is positioned so that the handle is to the right of the arrow (AA) on the jack plate. Tighten
the screws firmly with the Allen wrench supplied.
6.
Insert the hooks of the jack plate (S) through the jack plate, from the jack side, and secure them with the
wing nuts (T). Hang the springs on the jack plate (U) from the eyelets (BB) located on the bottom of the
upper frame beam.
7.
Place the jack plate assembly inside the frame and hook the jack plate springs to the jack plate hooks. Make
sure that the top of the hydraulic jack (CC) is inside the retainer (DD) at the bottom of the top beam of the
frame. Adjust the wing nuts as necessary so that the jack plate is level and the top of the hydraulic jack is
correctly positioned when the jack is fully retracted.
49
M
M
E
E
EN