Initial Assembly of the Machine (if applicable)
If delivered from a local distributor, the PC Series should be fully assembled, PDI'd & ready to go. For some customers the PC120 is shipped direct
from the factory, with the machine standing vertically on the pallet for ease of transport. Please follow instructions below for initial assembly.
Drawbar
Tools required: 17, 19 & 24mm Spanners
1. Lower the Paddock cleaner gently down with
supports beneath the black skid plates.
3. Next, install the REARMOST M12 bolt to the bottom
rear of the drawbar mount by offering up the
drawbar, inserting the bolt and fitting the washers
5. Supporting the weight of the drawbar, lift up until the
drawbar adjuster is in-line with the last M16 bolt at the top of
the drawbar mount, installing washers and nuts loosely..
There should be one aluminium spacing bush either side of
the adjuster itself (not shown in picture).
7. Lastly, install the Jockey wheel by unwinding the clamp, insert the jockey wheel into the clamp and tightening securely.
and nut loosely.
2. Remove the three bolts from the drawbar mount
(shown below), taking note of the number and
location of washers so that they are fitted in the
correct number on re-assembly.
4. Next, install the FRONTMOST M12 bolt & nut in
the slot at the front of the drawbar mount, again
fitting washers and nuts loosely
6. Tighten the top M16 bolt and nut using 24mm spanners
such that it secures the assembly without distorting the
orange drawbar mount inwards. Likewise the 2 x M12 bolts
need to be tightened to a sliding fit using 19mm spanners
so that the drawbar mount is not distorted inwards and it
can move freely when the height adjuster is rotated
4
English