SAULE
STO12
EN
Step 1: Installation of the Wall Brackets
Step 2: Installing the blind
Mounting the wall brackets
1. The height of the front bar will
determine the installation height of the
wall brackets. We recommend a drop
angle of 1-2'' per extension foot (1).
Multiply the arm projection by the
recommended angle in feet to obtain the
recommended drop or tilt. Add this to the
required front bar height and you will get
the wall bracket height (front bar height)
determined by the required ceiling
height of the front bar (example: 2» drop
x 10» canopy extension = 20» drop. 7» or
84» required ceiling height + 20» drop =
104» mounting height).
Side view
happy-garden.fr
Note: Call a professional for installation on a wall made of a
material other than wood or cement.
Step 1: Open the package, take out the wall brackets (P)
and wall plugs (FF) for installation on a wall or ceiling. Insert
the wall plugs (FF) into the holes, install the wall brackets
making sure they are level. Tighten the screws firmly.
Step 2: Take the blind and all accompanying hardware out
of the box. We recommend that two people lift the blind
to the height of the Wall Supports. Slide the blind into the
Wall Brackets (P), secure it with the screws (BB), washers
(CC) and nuts (DD). When installing the Wall Bracket (P), the
distance between the Wall Brackets and the Side Brackets
should not be greater than 50 mm.
Do not overtighten the screws, as this could cause an
accident!
This could break the fixings.
Position the dowels or joists in which you will place the
fasteners. Measure from a window or door to check where
the fastener will be approximately placed. Go inside the
building to take the same measurement. Using a ruler,
locate the location of the stud. Then go back outside and
mark the location of the pin. When the location is found,
drill a series of small holes to determine the spigots and
finally the centre for the trunnion (2). Then place the tie in
the centre of the trunnion mark, ensuring that the top of
the tie is at the top of the line and mark the centre of the
tie holes on the wall. Drill the pillar holes, again checking
that you have located the centre.
IMPORTANT: The bolts supplied may not be the correct
WALL
length for all installations. Securely fasten fasteners with
A) Front bar height
hold-down bolts at least two inches from the centre of the
B) Tilt
studs.
C) Attachment height
Search for
holes a
trunnion
Mark in the
Trunnion
centre &
behind
pilot hole
the wall
Trunnion
behind
the wall
27