NOTES: WORK AND PAUSE TIME PROGRAMMING
Mandatory procedure on new installations; its purpose is to enable the control unit to memorize the manoeuvre
times.
During the learning stage the TD button must be pressed a few times ( det. 6, fig 1); alternatively, the TD control
may be used (terminal 11, fig. 1), or the radio transmitter memorized in the first receiver channel.
Important notes before programming:
- Power the control unit and check the correct operation of the control inputs by observing the corresponding
LED's (the LED of the NC contacts must be on, the LED of the NO contacts must be off).
- Set the motor power to medium using trimmer T1 (det.2, fig. 1).
- Clear the manoeuvring area of the gate.
- Execute the time self-learning function by selecting one of the programming procedures described below.
MANUAL PROGRAMMING
Procedure:
1 - Shut off power supply to control unit
2 - Position the gate at mid-travel.
3 - Press PRG button
4,5,6 - Switch on power to control unit by keeping the PRG button (part 3 of fig.1) pressed for at least 3 seconds.
Programming LED L1 comes on.
7 - Press pushbutton TD: the rolling gate should move to close. If it moves to open, stop the programming
procedure and exchange the motor wires, then begin again from step (1).
8 - When the gate is closed press pushbutton TD once more.
9 - After a short pause, the gate will move to open.
10 - When it has opened all the way, press TD.
11 - Now that the gate is open you can either wait for the desired pause time to expire or (if you are not using
automatic re-closing) you can go straight to the next step.
12 - Press the TD pushbutton to close the gate.
13 - When it has closed all the way, press TD.
14 - Led L1 will go off, signalling the end of the programming procedure.
TAB. 4
PRG
PRG
TD
TD
PRG
PRG
TD
TD
GB
27