Descargar Imprimir esta página

Husky CWR48B Guía De Uso Y Cuidado página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

Assembly Instructions
Step 1
Determine the desired location and height for the wall
rack. Use a stud finder and measuring tape to locate two
wall studs approximately 48" apart from center to center
of studs (see Figure 1).
Figure 1
Locate two studs at 48"
apart using Stud Finder.
Note: Using a measuring tape be sure
to measure center to center of studs
Step 3
Install one Welded Bracket (A) using three Lag Bolts (F) and three Large Washers (K) into the pre-drilled holes using
1/2" socket wrench. Do not fully tighten all the way in at this point (leave about 1/4" out) (see Figure 4). Repeat
steps to install the other Welded Bracket (A) in the same manner (see Figure 5).
Figure 4
A
Tool(s):
1/2"Socket
Wrench
Step 2
Using the Welded Brackets (A) as a template, mark
the three hole locations with pencil at the center of
each stud for both sides (see Figure 2). Use a leveler
to make sure the marked hole locations are level.
Pre-drill the marked hole locations using a cordless
power drill with 7/32" drill bit (see Figure 3).
Do not fully tighten
Lag Bolts at this point.
They will be tightened
at the end of the
assembly.
3
Figure 2
A
x
x
x
Tool(s):
power drill and
Figure 3
A
Cordless
7/32"drill bit
Figure 5
A

Publicidad

loading

Este manual también es adecuado para:

1004186968