S19-244 & S19-244FW
Assemble Components
The top of the eyewash heads should be 33–45" (838–1143 mm) from the floor.
1. Select the desired location for the eyewash on the sink deck and drill a 7⁄8" diameter hole.
2. Assemble the components as shown on page 5.
• Apply pipe sealant (supplied by installer) to all male-threaded pipe joints.
• Use a strap wrench around pipes when tightening to prevent marring the BradTect ® protective,
safety yellow coating.
Connect Water Supply
1. Connect the water supply piping (by installer) to the ½" NPT inlet on the eyewash.
2. Open the water supply lines. Test for leaks and adequate water flow.
3. Mount the safety sign to the wall using the sign-mounting hardware supplied by the installer.
All dimensions assume standard thread engagement. Variations in manufacturing allow for ±1/8" (3 mm) per thread joint.
To find the tolerance of a dimension, add the number of thread joints in between a dimension and multiply it by 1/8" (3 mm).
Connect the water supply using installer supplied supply line. Mount the safety sign to wall or pipe using sign-mounting
hardware supplied by installer. Open the water supply lines. Test for leaks and adequate water flow.
Dimensions
Model S19-244
6⁵⁄₈" (167)
1¹⁄₈" (29)
4"
(103)
¾" (19)
4
3⁵⁄₈"
(92)
2⁵⁄₈"
(67)
5³⁄₈" (136)
1/7/2022
Model S19-244FL
8¼" (211)
1¾" (46)
4"
(103)
¾" (19)
Bradley • 215-1933 Rev. A: ECO 21-05-033
Installation
(mm)
3⁵⁄₈"
(92)
5¾"
(147)
5³⁄₈" (136)