Descargar Imprimir esta página

Glacier bay HD67693W-6201 Guía De Uso Y Mantenimiento página 6

Dorind-mezcladora para bano, de arco alto, con 2 manerales y pieza extendida de 8'

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
6
Attaching the quick connect
Attach the quick connector (J) to the Spout (A)
connection, the hot faucet handle (B) connection,
and cold faucet handle (C) connection. Push until
the connections snap together.
Pull down moderately to ensure the connections
have been made.
Click
7
Making the water supply
connections
Remove the sleeve from the inlet tube.
Use 1/2 in. I.P.S. faucet connections (2), or use
supply line coupling nuts (3) (not included) with
a 3/8 in. O.D. ball-nose riser (1).
If it is necessary to plug up one of the inlet tubes,
use a plug (not included) with a washer.
IMPORTANT: WHEN PRE-TIGHTENING THE WATER
SUPPLY LINE TO THE FAUCET CONNECTOR, A SECOND
WRENCH MUST BE APPLIED TO THE INLET SUPPLY TUBE
FITTING TO PREVENT IT FROM MOVING OR TWISTING
WHEN TIGHTENING THE WATER SUPPLY LINE. DO NOT
OVERTIGHTEN.
Click
Click
2
1
2
1
6
B
A
C
J
1
2
3
2
2

Publicidad

loading