Descargar Imprimir esta página

Casselin CSMJ Manual Del Usuario página 18

Secamanos jedy

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 35
Note :for two or more dryers, the dryers shall not be located closer than 610 mm (24 inches) center to
center.
3. Remove and keep the tray, the 2 cover screws and the cover (see fig.2).
4. Remove and save screw 11 and the hanging board.
5. Secure the hanging panel to the wall using the screws and anchors provided.
6. Hang the hand dryer and secure it with screw 11.
7. Connect the power cord to the terminal block where indicated (see fig.4).
Connections:
A. Connect the live wire (brown or red) to the terminal block marked "L".
B. Connect the neutral wire (blue or black) to the terminal block marked "N".
C. Connect the ground wire (Green and Yellow) to the terminal block marked ''
Note :Refer to the appropriate wiring diagram. Make sure all ground connections are made.
8. Replace the cover. Won't be too screwed. Replace the tray.
RECOMMENDED MOUNTING HEIGHTS
From the floor to the bottom of the dryer.
Men
Ladies
13"
11"
350mm
300mm
TO START UP
1.
Turn on the hand dryer.
2.
Turn on the heating element if hot air is needed.
3.
LCD screens(see fig.5)
Power indicatororange- the hand dryer is on standby.
Hand dryer activated, heat indicator turns red - hot air is available.
Fig.2
Children aged 11 to 17
10"
250mm
Fig.3
Children aged 3 to 10
6"
150mm
''.
Disabled
4"
100mm
EN

Publicidad

loading

Este manual también es adecuado para:

Csmjb36116300904213611630090414