AGO
To operate a good installation of the gear motors AGO, follow these instructions:
1 - Open the box and take out gear motor. Make sure that it has not been damaged during the transport.
2 - Make sure that the leaf of the gate is perfectly horizontal.
3 - Place the gear motor tilted approximately 1º below the horizontal line (PIC. 3).
4 - Fix the support plate A on the pillar beside the leaf, taking in account the measures shown in TAB. 1 and PIC. 4.
Do not forget inclination.
5 - Install the gear motor on to the support plate A and fix it with the bolt.
6 - With gate's leaf closed, turn and slide the screw of gear motor's D shaft, until the end of the stroke.
7 - Screw D shaft back on 1 complete turn of 360º (PIC. 5).
X
360°
15
UK
PIC. 3
PIC. 4
PIC. 5