Safety Notes
Gloves should be worn during installation to prevent
crushing and cutting injuries.
The product may only be used for bathing, hygienic
and body cleaning purposes.
The hot and cold supplies must be of equal pressures.
Installation Instructions
• Prior to installation, inspect the product for transport
damages. After it has been installed, no transport or
surface damage will be honoured.
• The pipes and the fixture must be installed, flushed
and tested as per the applicable standards.
• The plumbing codes applicable in the respective
countries must be observed.
• Connection with flexible hose code nr. 58192000.
(see page 35 Fig. A)
Installation to DIN 1988
When installing a different flush-type fitting than the iBox
universal, DIN EN 1717 requires the pipe interruptor
(DB) to be at least 150 mm above the tub brim.
(see page 35 Fig. A)
Installation to EN 1717
(see page 35 Fig. C)
Use of the flush plug
(see page 35 Fig. D)
• Testfilling of the bath tub.
• Flushing of the pipes.
• Pressure test of the pipes between mixer and flush
plug
• The residual water jet during pressure test is taken into
account. It shall remind you of closing the mixer after
the pressure test and avoid cross flow at the mixer.
Technical Data
Sequence power:
overflow capacity
The product is exclusively designed for drinking water!
4
English
53 l/min
36 l/min
Assembly (see page 35)
Symbol description
Do not use silicone containing acetic acid!
Dimensions (see page 36)
Flow diagram (see page 36)
Spare parts (see page 40)
+
Special accessories (see page 40)
order as an extra
• connection hose #58192000
• Installation putty
Cleaning (see page 37)
Test certificate (see page 41)