baracuda G2 Manual Del Usuario página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Prepare the Pool
1. Manually vacuum the pool if excesssive debris is present,
and make sure the pool filter and pump basket are clean.
2. Close the pool main drain line.
3. Adjust the return lines to blow downward
to break up surface circulation and ensure
complete cleaning coverage.
• Loosen the fitting lock ring
• Redirect the eyeball downward
• Retighten the lock ring
If the return fitting cannot be adjusted, the
fitting must be replaced with a Baracuda
diverter (part #W90153 for 1 ½ in. (3.8 cm), #W90155 for
2 in. (5 cm) or #W24100 for pools without return fittings) .
Assemble the Cleaner
Stretch the disc over the foot pad with the
fins pointing up. The disc should fit securely
in the groove and rotate freely on the pad.
Slide the wheel deflector onto the extension
pipe, clips up, and secure between the two
lowest pipe ridges. The deflector should
rotate freely
Assemble the Hose
For corner or end installations, connect enough
hose to reach the farthest point of the pool and
then add one more section.
Position the hose weight(s), two for US/Mexico installations and one for Canadian, in the middle of the
second hose section, about 60 in. (1.5 m) back from the end of the hose.
4
®
return line
For center installations, connect enough hose to
reach the farthest point of the pool and then add
two more sections.

Publicidad

Tabla de contenido
loading

Productos relacionados para baracuda G2

Tabla de contenido