Terminal Block Installation
NOTE: Ensure all power is off/disconnected before beginning!
1 Loosen appropriate screws.
2 Insert bare power-supply wires into appropriate terminal slots (positive
wire into positive slot; negative wire into negative slot).
3 Tighten appropriate screws to secure wires. (If desired, repeat steps 1 – 3 on second input pair.)
4 Install block into the device and tighten screws.
1
Power Off Alarm
You can choose whether to connect the power failure warning device to the
connecting terminal marked "Fault" according to your requirements. When using
power redundancy, if one power source fails, a fault alarm will be generated.
Placement
Desktop Installation
Prior to use, place/position the switch:
• on a level surface that can support the weight of the switch and that
offers at least 25 mm (approx. 1") of clearance for ventilation;
• away from sources of electrical noise: radios, transmitters, broadband amplifiers;
• within 100 m (approx. 328') of network devices it's to be connected to;
• where it cannot be affected by excessive moisture.
DIN-Rail Installation
1 With DIN-rail bracket attached to device with screws, angle bracket onto DIN rail.
2 Push device in till it clicks into place.
2
1
Instructions
3
2
4
English
3