TOOLS REQUIRED: 7/16", 1/2", 9/16", and 5/8" sockets and ratchets, block(s) of wood (minimum of 6" tall).
Refer to the parts list on page 9.
WHEEL INSTALLATION
1. Block up end of generator opposite the fuel tank cap to install wheel kit.
2. Insert wheel spacer (item 45) into the center of the wheel (item 31).
3. Slide 3/8 x 4.25" bolt (item 35) and 3/8 washer (item 47) through the wheel (item 31), then through the wheel bracket on the
carrier, with the offset side of the wheel hub against the wheel bracket.
4. Thread 3/8 nyloc nut (item 36) onto the bolt and tighten to securely clamp the wheel assembly to the tubing.
5. Repeat above instructions for the remaining wheel.
FOOT INSTALLATION
1. Assemble the rubber feet (item 32) to the foot bracket (item 27) using a 1/4-20 x 1.5" bolt (item 29). Thread a 1/4 washer
(item 39) and a 1/4 nyloc nut (item 13) to the bolt to secure the assembly. Caution: Do not over tighten so that the foot
material collapses.
2. Blocking up the alternator side of the generator, place the foot bracket under the carrier channel. Thread a 5/16-18 x 1" bolt
(item 48) with a 5/16 washer (item 34) through the mounting holes and thread a 5/16 washer (item 34) and a 5/16 nyloc nut
(item 4) to the bolt to secure the foot bracket to the carrier.
HANDLE INSTALLATION
1. Place handle (item 28) over carrier tubing on same end as feet, centering handle on the carrier.
2. Slide 5/16 x 2.25" bolt (item 30) through handle, handle bracket, and 5/16 washers (item 41) as shown in diagram and
secure with 5/16" nyloc nut (item 4). Tighten until handle is securely clamped to the bracket.
LOCKING HANDLE
1. Attach the lanyard (item 44) to the release pin
(item 40) and carrier as shown in the illustration.
2. To lock the handle (item 28) in the extended
position, align the holes in the handle bracket
with the holes in the carrier bracket and insert
the release pin (item 40).
English
PORTABILITY KIT INSTALLATION
1
44
40
2
3