Descargar Imprimir esta página

Intellinet Network Solutions 562027 Manual De Instrucciones página 2

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 6
This guide presents the basic steps to set up and operate this device.
For the user manual and specifications, visit intellinet-network.com.
Register your product at register.intellinet-network.com/r/562027
or scan the QR code on the cover.
Front Panel
LEDs
The LED indicators make it easier to monitor the switch and its connections.
LED
Color
PWR
Green
Link/
Green
Act
PoE
Green
Ports
All ports on the switch support Auto-MDI/MDI-X functionality, so
crossover cables and uplink ports are not needed for connections
to PCs, routers, other switches, etc. Cat5e/6/6a UTP/STP cables
provide optimal performance; if a status LED doesn't indicate a link,
check the corresponding device for proper setup and operation.
Rear Panel
Power
Use the provided power adapter to plug the back of the switch
into a power outlet and make sure the power LED is on.
2
English
Status
On
Off
On
Flashing
Off
On
The connected powered device is receiving power.
Off
Operation
Power On
Power Off
Valid port connection.
Sending or receiving data
No link established.
No PSE/PoE device is linked.
Instructions

Publicidad

loading

Este manual también es adecuado para:

Ips-08g02-58w