Mounting instructions information
The mounting instructions come as part of the Duravit
product and must be read carefully prior to installation.
Target readership and qualifications
The toilet frame may only be installed by a qualified
plumber. The electrical installation should only be carried
out by qualified electricians.
Explanation of the symbols
Link to the mounting instructions in this section
Link to other instructions
Cold water
Water installation
Inspect to check for leaks and leak-tightness
>
Action required
Safety instructions
Risk of fatal electric shock
Contact with electricity can lead to an electric shock.
> Carry out the electrical installation in accordance with
the national, European and international directives and
standards.
Product and/or property damage
A breach of local and country-specific regulations and
standards can cause damage to the product
and/or property damage.
> Observe the local installation regulations and any
country-specific standards at all times.
57431_MAL_WC-Element_Basic.indb 5
Prior to the installation
> Check the load-bearing capacity of the wall.
> Please read the pre-installation data sheets.
These are available to download on the Internet at
www.pro.duravit.com.
Mounting instructions
+
8
14
Observing the position of the drain
The height of the drain must be preset at
220/240 mm for the toilet frames. The height of the
toilet frames can be adjusted individually.
> Set the height of the toilet frame based on the
position of the drain according to the technical
drawing of the toilet. There is no marking for the
reference marker with reduced frame heights.
36
Installing the power supply for the hygienic flush
(optional)
Optionally only for #WD1020.
> Mount the installation set for the hygienic flush.
40
Observing the load-bearing capacity of the wall
> Please read the pre-installation data sheets.
41
Observing the position of the toilet actuator plate
The toilet actuator plate can be mounted from the
front or top with reduced frame heights (#WD1017,
#WD1019).
> Check that the transport lock has been removed
before installing the panelling.
• Panelling for actuation from the front:
> install the panelling at the front.
> Install the panelling at the top until the top
panelling butts against the front panelling.
• Panelling for actuation from the top:
> install the panelling at the top.
> Install the panelling at the front until the top
panelling butts against the top panelling.
5
70300108_Toilet frame_Basic
03.03.2021 13:34:58