Descargar Imprimir esta página

VEVOR BEE HIVE FX1+2 Manual De Instrucciones página 8

Colmena

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 72
170 BOX
4. Installation of 170 box
Step 1: Take two pieces of A2 and two pieces of B2(B2-1&B2-2)
respectively, and connect them with a rubber hammer (note that it is not
allowed to knock them directly, but put a board or cardboard on them and
knock them in evenly).
5. Installation of 170 frame
Step 1: Take 2 pieces of E2 and 1 piece of C, insert them into the card slot
to connect them, then take 1 piece of F2 and insert it into the slot, and
finally take 1 piece of D and insert it into the slot to complete a set of 170
frames.
- 7 -

Publicidad

loading

Productos relacionados para VEVOR BEE HIVE FX1+2