Ferroli SUN G10 2S Instrucciones De Uso, Instalación Y Mantenimiento página 29

Quemador de gasóleo
Ocultar thumbs Ver también para SUN G10 2S:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

SUN G10 2S
Key
A
Start of commissioning for burners with no pre-heater
B
Flame ignition time
C
Operation
D
Stop for R adjustment
t1
Pre-ventilation time
t3
Pre-ignition time
t3n
Time after ignition
t4
Interval between flame signal and BV2 supply
TSA
Safety time on starting
In particular, with single-tube systems, if the fuel inlet pipe is initially empty, the air contained
in the pipe must be vented for the fuel pump to be primed. It is recommended, before igniting
the burner, to loosen the pressure gauge connection screw on the pump and then perform the
ignition cycle.
When the oil comes out of the screw, the pump is primed. Switch off the burner and tighten the
screw.
fig. 9
Cod. 35445523 - 02/2007 (Rev. 00)
29

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sun g10

Tabla de contenido